Case study · Boutique hotel

Boutique Hotel — Sculpted Microcement Lobby, Cave Suites & Monolithic Floors

A whole-floor renovation finished almost entirely in CALMURA microcement and warm peach-cream limewash — from the sculpted mushroom columns at the reception, through arched corridors, to the cave-mouth suites with their oval mirror cut-outs and wall-to-floor monolithic finish.

Boutique hotel renovation~ 1,400 m² floor + ~ 2,200 m² wall (lobby, corridors, 30+ guest suites)China (project city undisclosed at owner’s request)Completed 2026-04
Boutique hotel lobby with three organic microcement mushroom columns flowing from the ceiling to a continuous warm-white microcement floor, with a soft-pink reception counter on the left
Photographed on site · published with client permission

The brief was “one material, one colour temperature, every surface”. The studio wanted the entire floor — lobby, corridors, all guest suites — to read as a single carved volume rather than a hotel built room-by-room. Skirting, panel joints and trim were all forbidden. CALMURA was specified as the sole finish system across walls and floors.

The lobby is the headline gesture: the ceiling slumps down into three organic mushroom columns that reach the floor, all built in render and finished in our microcement so the joint between ceiling, column and floor is invisible. Behind the soft-pink reception counter, the wall climbs the same way. The whole ground level uses one continuous microcement pour in our warm-white colourway, with a recessed perimeter shadow gap so the floor reads as a single 1,400 m² plate.

The 30-plus guest suites carry the same logic at room scale. Each suite door is set into a cave-mouth arch, the bathroom partition has an oval mirror cut directly out of the wall, and the microcement floor flows past the bed, under the millwork and out to the picture window. The corridors between suites repeat the warm peach-cream limewash on the upper walls and CALMURA microcement on the floor with recessed LED light lines hidden in the soffit.

CALMURA shipped the full system in two consolidated 40′ HQ containers from Yantian — microcement primer, two-coat microcement powder, water-based PU sealer, the trowels and burnishing pads, plus the limewash for the corridors. Three of our application advisers spent a total of 11 weeks on site working alongside the studio’s plaster crew. VOC across the delivered system tested at < 5 g/L on the per-batch ISO 11890-2 reports that shipped with each container.

On site, on video

Walk through the finished project — and the trowels that finished it.

Filmed during the finish phase by the studio and the CALMURA application team. No sound, no edit, no music — just the project as it stood when the shutter rolled.

On-site — microcement trowel applicationTwo CALMURA application advisers troweling microcement onto a hotel wall in real time. The proof shot — real workers, real wet plaster, no render.
Walk-through — cave-arch guest suiteFrom the corridor into a finished guest suite: cave-mouth arch, oval mirror cut directly out of the microcement wall, monolithic floor flowing through to the city-view balcony.
Walk-through — monolithic bedroomInside the bedroom: integrated cove lighting behind the bedhead, single microcement plane reading wall-to-wall.
Walk-through — suite pantry & sculpted columnSuite pantry/kitchenette: microcement floor running under the timber millwork, sculpted column with two circular cut-outs.

Project gallery

On site, in real conditions — photographed during finish and handover.

Hotel corridor with arched openings, peach-cream limewash walls and a continuous warm-white microcement floor, recessed LED light strip in the soffit
Long view down a hotel corridor finished in peach-cream limewash and microcement floor, doors recessed into the wall
Guest suite entry framed as a sculpted cave arch with an oval mirror cut directly out of the microcement wall, washing-machine niche on the right and city-view balcony at the end
Hotel guest bedroom finished in continuous microcement — wall, ceiling and floor read as a single plane, integrated cove lighting behind the bedhead
Suite pantry / kitchenette in the same project — microcement floor running under timber millwork, sculpted column with two circular cut-outs
Two CALMURA application advisers troweling microcement onto a hotel wall in real time — photographed during the 11-week finish phase

Finish stack

What was specified, where it went, and how much of it shipped.

Lobby ceiling, mushroom columns, all corridor & suite floors

Microcement Pro System — warm-white colourway, water-based PU sealer

Two-coat microcement applied over CALMURA microcement primer, then sealed with two coats of water-based PU. One continuous pour line per zone with a recessed perimeter shadow gap. ~ 1,400 m² floor + ~ 480 m² sculpted wall/ceiling.

View Microcement spec sheet →

Corridor walls, all guest-suite walls

Mineral Limewash — peach-cream tint

Two coats applied with a wide block brush, deliberately under-burnished so each suite reads slightly differently in daylight. ~ 1,720 m² of wall area across corridors and 30+ suites.

View Limewash spec sheet →

High-touch wall zones (reception, lift lobbies, bathrooms)

Cera Forte 2K Clear Topcoat — matte

Selectively applied to the lower 1.4 m of high-traffic walls so daily housekeeping cleaning does not burnish the limewash sheen. Specified by the operator after a 30-day mock-up suite.

View Cera Forte spec sheet →

Bathroom wet zones inside suites

Idraflex Waterproof Membrane — under microcement

Two-coat elastic waterproof membrane applied over the slab and shower walls before the microcement topcoat, for a fully tanked yet seamless wet area.

View Idraflex spec sheet →

Project facts

The numbers we’ll show your specifier.

Project type
Boutique hotel renovation, 30+ keys
Treated area
~ 1,400 m² floor + ~ 2,200 m² wall
Finish system
Microcement Pro + Mineral Limewash + Cera Forte 2K + Idraflex (wet zones)
VOC (delivered)
< 5 g/L (per-batch ISO 11890-2)
Containers
2 × 40′ HQ, FOB Yantian — single sailing
Application support
Three CALMURA advisers, 11-week finish phase
Design studio
Anonymous at client request (NDA)
Completed
Q2 2026

Want this finish on your project?

We can supply the same system anywhere CALMURA ships.

Send us a brief — wall area, floor area, destination port and target colour — and we’ll come back with line-item pricing, container plan and lead time within one business day. See wholesale terms for MOQ, Incoterms and indicative price bands.

Bring CALMURA into your next project.

Talk to our project services team for sampling, factory tinting, technical sheets and global shipping quotes.